With limited headroom and the need to work on small components, as well as load and unload entire jet engines, the 148th Fighter Wing needed a flexible solution for their facility.
Our solution included two top-running double-girder cranes with two hoists: a 3-ton for moving the entire engine assembly, and a 1-ton for smaller parts, making multiple picks per day. The double crane setup also allows for simultaneous work at multiple stations.
Radio controls remove the issues of working around a pendant cable, allowing for precise parts placement.